Detailed Project Reports (DPRs)
(Prepared under BEE-SME programme)
Ahmedabad Chemical Cluster
- DPR on energy efficient gas fired hot air generator (30000 kCal)
- DPR on energy efficient gas fired hot air generator (60000 kCal)
- DPR on energy efficient gas fired hot air generator (120000 kCal)
- DPR on energy efficient tray dryer (96 trays)
- DPR on energy efficient tray dryer (200 trays)
- DPR on energy efficient tray dryer (400 trays)
- DPR on energy efficient vertical agitator (6000 liter)
- DPR on energy efficient vertical agitator (32000 liter)
- DPR on hybrid solar tray dryer (96 Trays)
- DPR on hybrid solar tray dryer (200 Trays)
- DPR on membrane filter press (40 Plates)
- DPR on membrane filter press (60 Plates)
- DPR on wood fired energy efficient hot air generator (30,000 kCal)
- DPR on wood fired energy efficient hot air generator (60,000 kCal)
- DPR on wood fired energy efficient hot air generator (120,000 kCal)
Alwar oil mills cluster
- Energy efficient motor for expeller (30 HP)-Alwar OM cluster
- Energy efficient motor for kolhu (40 hp)-(Alwar OM cluster)
- Energy efficient motor for Kolhu (50 HP)-(Alwar OM cluster)
- Energy efficient motor for expeller (50 HP) - (Alwar OM cluster)
- Energy efficient motor for expeller (75 HP)- Alwar OM cluster)
- Energy cost reduction with e.e. seed cracker motor (15 HP)-(Alwar OM cluster)
- Energy cost reduction with eco ventilator in place of exhaust fans-(Alwar OM cluster)
- Energy cost reduction with e.e. expeller - (Alwar OM cluster)
- Energy cost reduction with power factor Improvement-(Alwar OM cluster)
- Energy cost reduction by replacemt of reciprocatg comprsr with screw comprsr
- Energy cost reduction by replacement of reciprocatg compresrs with screw comprsr
- Energy cost reduction with translucent sheet (Alwar OM cluster)
- Energy cost reduction with variable frequency drive over compressor
- Energy cost reduction with energy efficient expeller
- Energy cost reduction with flat belt in place of V-belt
Bhimavaram ice making cluster
- Energy efficient motor for agitator – 7.5hp-Bhimavrm IMC
- Energy efficient pump for condenser water–3 hp-Bhimavrm IMC
- Energy efficient pump for raw water– 2 hp-Bhimavrm IMC
- Energy efficient motor for compressor-60HP-Bhimavrm IMC
- Energy efficient motor for compressor-75 HP-Bhimavrm IMC
- Energy efficient motor for compressor-150 HP-Bhimavrm IMC
- New Refrigiration compressor-60 HP-Bhimavrm IMC
- New Refrigiration compressor-75 HP-Bhimavrm IMC
- New Refrigiration compressor-150 HP-Bhimavrm IMC
- Tube ice plant-10 TPD-Bhimavrm IMC
- Tube ice plant-15 TPD-Bhimavrm IMC
- Tube ice plant-20 TPD-Bhimavrm IMC
- VFD for compresor motor-60 HP-Bhimavrm IMC
- VFD for compresor motor-75 HP-Bhimavrm IMC
- VFD for compresor motor-150 HP-Bhimavrm IMC
Batala Jalandhar Ludhiana foundry cluster
- Energy efficient motor for blower in cupola furnace (10 hp)-Batala-Jlndr-Ludh Fdry Cluster
- Divided blast cupola furnace-Batala-Jlndr-Ludh Fdry Cluster
- Installation of eco ventilators in place of exhaust fan-Batala-Jlndr-Ludh Fdry Cluster
- En cost reduction with insulation improvemt by insulation paint coatgs--Batala-Jlndr-Ludh Fdry Cluster
- PF improvement by installation of capacitor banks-Batala-Jlndr-Ludh Fdry Cluster
- Energy efficient motor in rotary furnace (10 HP)-Batala-Jlndr-Ludh Fdry Cluster
- Replacement of arc furnace with medium frequency induction furnace-Batala-Jlndr-Ludh Fdry Cluster
- En cost reductn with kwh indicator cum integrator for inductn furnace-Batala-Jlndr-Ludh Fdry Cluster
- Installation of flue gas analyser to reduce excess air and optimising furnace combustion eff.-Batala-Jlndr-Ludh Fdry Cluster
- Replacement of oil fired rotary furnace with induction furnace-Batala-Jlndr-Ludh Fdry Cluster
- Energy cost reduction with infrared thermometer-Batala-Jlndr-Ludh Fdry Cluster
- Medium frequency furnace in place of main frequency furnace-Batala-Jlndr-Ludh Fdry Cluster
- Energy efficient motor in rotary furnace (15 HP)-Batala-Jlndr-Ludh Fdry Cluster
- Spectrometer for analysing the molten metal-Batala-Jlndr-Ludh Fdry Cluster
- Installation of VFD on screw compressor-Batala-Jlndr-Ludh Fdry Cluster
Bangalore machine tools cluster
- Installation of 5 – axis CNC machine-BNG MTC
- Replacement of reciprocating compressors with screw compressors-BNG MTC
- Replacement of conventional grinding machine to CNC grinding machine-BNG MTC
- Conventional cutting machine with CNC laser cutting machine-BNG MTC
- Replacement of conventional milling machine to CNC milling machine-BNG MTC
- Conventional turret punch machine with CNC turret punch machine-BNG MTC
- Conventional bending machine to CNC bending machine-BNG MTC
- Replacement of conventional wire cut machine with CNC wire cut machine-BNG MTC
- Replacement of conventional gear hobbing machine to CNC gear hobbing machine-BNG MTC
- Replacement of conventional horizontal machine centre with CNC horizontal machine centre-BNG MTC
- Energy efficient motors 7.5 kW capacity-BNG MTC
- Replacement of Conventional lathes-BNG MTC
- Replacement of reciprocating compressors with screw compressors
- Replacement of conventional machine with CNC machine-BNG MTC
- Replacement of milling, turning machines to CNC turn–mill centre-BNG MTC
Bhubaneshwar brass cluster
- DPR on Common Facility Melting and Re-Heating Furnace 250kg
- DPR on Common Facility Melting and Re-Heating Furnace 500kg
- DPR on Common Facility Mordern Unit 250kg
- DPR on common facility rice husk based Mordern Unit (250kg)
- DPR on Common Facility Rice Husk Gasification 2500kg
- DPR on Common Facility Rice Husk Gasification 5000kg
- DPR on Energy Efficient Melting Furncae 100kg
- DPR on energy efficient melting furncae (30kg)
- DPR on energy efficient melting furncae (60kg)
- DPR on Energy Efficient Re-Heating Furnace 30kg
- DPR on Energy Efficient Re-Heating Furnace 60kg
- DPR on Energy Efficient Re-Heating Furnace 100kg
- DPR on Rice Husk Gasification 30kg
- DPR on Rice Husk Gasification 60kg
- DPR on Rice Husk Gasification 100kg
East and West Godavari refractories cluster
- Biomass gasifier system-up to 50ton capacity kiln-Godavari Refr cluster
- Biomass gasifier system-up to 100ton capacity kiln-Godavari Refr cluster
- Biomass gasifier system-up to 200ton capacity kiln-Godavari Refr cluster
- Coal gasifier system-50 tons capacity kiln-Godavari Ref cluster
- Coal gasifier system-100 tons capacity kiln-Godavari Refr cluster
- Coal gasifier system-200 tons capacity kiln-Godavari Refractr cluster
- Tunnel kiln-10 TPD
- Tunnel Kiln-20 TPD-Godavari Refr cluster
- Tunnel Kiln-50 TPD-Gadavari Refract cluster
- WHR 100 Ton kiln-Godavari Refr cluster
- Waste heat recovery system -200 tons capacity kiln-Godavari Refr cluster
- Energy efficient motor for ball mills-20hp-Godavari Refract cluster
- EE Motor for Brick Press -10HP
- EE Motor forCrushers -10HP-Godavari Refract cluster
- WHR upto 50 Tons kiln-Godavari Refract cluster
Ganjam rice mill cluster
- Energy efficient motor 30 hp-Ganjam Rice mill
- Energy efficient motor 40 hp-Ganjam Rice mill
- Energy efficient motor 50 hp-Ganjam Rice mill
- Replacement of cones polishers with Whitener 1.0 ton-Ganjam Rice mill
- Replacement of cones polishers with whitener-1.5 - 2 tph-Ganjam Rice mill
- Common shaft drive system (1.0 TPH)-Ganjam Rice mill
- Common shaft drive system (1.5 tph)-Ganjam Rice mill
- Common shaft drive system (2.0 tph)-Ganjam Rice mill
- Paddy cleaner 1.0 ton-Ganjam Rice mill
- Paddy cleaner 1.5ton-Ganjam Rice mill
- Paddy separator 1.0 ton-Ganjam Rice mill
- Paddy Separator 1.5 ton-Ganjam Rice mill
- Paddy separator 2.0 ton-Ganjam Rice mill
- Voltage stablizer75 KVA-Ganjam Rice mill
- Voltage stablizer 50 KVA-Ganjam Rice mill
Gujarat dairy cluster
- DPR on De-Super Heater System 100 TR
- DPR on De-Super Heater System 210 TR
- DPR on Effulent Methane Capture 1000 CUBM
- DPR on Effulent Methane Capture 500 CUBM
- DPR on Energy Efficient Motor_30kW
- DPR on Energy Efficient Motor_55kW
- DPR on Energy Efficient Motor_75kW
- DPR on Energy Efficient Thermal Storage System 300 TRH
- DPR on Energy Efficient Thermal Storage System 420 TRH
- DPR on Energy Efficient Thermal Storage System 65 TRH
- DPR on Soft Starter for Motor_30kW
- DPR on Soft Starter for Motor_75kW
- DPR on Solar Water Heating System 10000 LPD
- DPR on Solar Water Heating System 5000 LPD
- DPR on Solar Water Heating System 7000 LPD
Howrah galvinising and wire drawing cluster
- DPR on Air Fuel Ratio Control with Oxygen Sensor
- DPR on Air Pre Heater for galvanizing and annealing furnace
- DPR on AIR PRE-HEATER AND DRYING BED FOR GALVANIZING AND ANNEALING FURNACES
- DPR on Air Pre-heater Heat Pipe Heat Exchangers for Galvanizing and Annealing Furnaces
- DPR on Air-Pre Heater and Flux Solution Heating for Galvanizing and Annealing Furnaces
- DPR on Biomass Gasifier for Coal Based Furnaces
- DPR on Biomass Gasifier for FO Based Furnaces
- DPR on DC motor of 160 kW with AC Motor of 90 kW with VFD
- DPR on DC motor of 260 kW with AC Motor of 180 kW with VFD
- DPR on Energy Efficient Motor 15 kW
- DPR on Energy Efficient Motor 22 kW
- DPR on Furnace Insulation Improvement
- DPR on LPG Gas Fired Radiation Furnace for Annealing
- DPR on Temperature Control in Zinc Bath in Galvanizing
- DPR pm Energy Efficient Motor 45 kW
Jagadhri brass and aluminium cluster
- Bogies Brass anneling funace 36 kW-Jagadhri cluster
- Bogies Brass anneling funace 60 kW-Jagadhri cluster
- Energy Efficient Pit Furnace 600 kg-Jagadhri cluster
- Induction furnace for brass 500kg-Jagadhri cluster
- Modified Pit Furnace for brass 600 kg-Jagadhri cluster
- Induction furnace for brass 750kg-Jagadhri cluster
- Waste heat recovery for coke fired pit furnace 600kg-Jagadhri cluster
- Wood gasifier aluminium 400kg-Jagadhri cluster
- Wood gasifier aluminium 600kg-Jagadhri cluster
- Wood gasifier aluminium 800kg-Jagadhri cluster
- Wood gasifier for anneling funace above 3T-Jagadhri cluster
- Wood gasifier for coke fired brass melting furnace-Jagadhri cluster
- Wood gasifier for anneling funace below 3T-Jagadhri cluster
- wood gasifier for oil fired Brass melting furnace-Jagadhri cluster
Jodhpur lime kiln cluster
- Energy cost reduction with power factor correction-Jodhpur cluster
- Energy cost saving by installing gasifier for kilns 15tpd-Jodhpur cluster
- Energy cost reduction by installling gasifier for kilns 30 tpd-Jodhpur cluster
- En cost saving by kiln insulation improvement for 50tpd kiln-Jodhpur cluster
- En cost reduction with energy efficient motor (7.5 hp)-Jodhpur cluster
- En cost reduction with e.e. motor (15HP)
- Improved handling-storage of pet coke in large units-Jodhpur cluster
- Improved handling-storage of pet coke in medium units-Jodhpur cluster
- En cost saving by kiln insulation improvement for 30tpd capacity kiln-Jodhpur cluster
- Energy cost saving by kiln insulation improvement capacity-15tpd-Jodhpur cluster
- Energy cost reduction with energy efficient motor (40 HP)-Jodhpur cluster
Jorhat tea cluster
- Biomass gasifier for 250 kW thermal application replacing coal-Jorhat
- Biomass gasifier of 50 kW electrical application-Jorhat
- Tech upgradation with coal gasification for thermal & captive generation-Jorhat
- Tech upgradation with coal gasification for thermal & 100kva captive generation-Jorhat
- EE_Gas_Burner-Jorhat
- Energy efficient motor of 15 kw in hot air blower of drier-Jorhat
- Energy efficient motor of 18.5 kw in hot air blower of drier
- Energy efficient motor of 22 kw in hot air blower of drier-Jorhat
- Tech upgradn with automatic airflow variation in withering system-Jorhat
- Tech upgradn with automatic airflow variation in withering system 16 troughs-Jorhat
- Energy efficient NG burner150 KG D-Jorhat
- Solar – aero generator hybrid power system-Jorhat
- Solar – aero generator hybrid power system-Jorhat
- Vfd fitment in hot air blowing system in drier having 25 HP motor-Jorhat
- VFD fitment in hot air blowing system in drier having 30 HP motor
Jamnagar brass cluster
- DPR Energy Efficient Gas Fired Rotoberatory Furnace_250 kg
- DPR on Energy Efficient Gas Fired Pit Furnace_200 kg
- DPR on Energy Efficient Gas Fired Pit Furnace_300 kg
- DPR on Energy Efficient Gas Fired Pit Furnace_350 kg
- DPR on Energy Efficient Gas Fired Reheating Furnace_750 Kg
- DPR on Energy Efficient Gas Fired Reheating Furnace_1200 Kg
- DPR on Energy Efficient Gas Fired Reheating Furnace_2000 Kg
- DPR on Energy Efficient Gas Fired Rotoberatory Furnace_500 kg
- DPR on Energy Efficient Gas Fired Rotoberatory Furnace_750 kg
- DPR on Energy Efficient Oil Fired Pit Furnace_150 kg
- DPR on Energy Efficient Oil Fired Pit Furnace_300 kg
- DPR on Energy Efficient Oil Fired Pit Furnace_400 kg
- DPR on Energy Efficient Gas Fired Reheating Furnace_750 Kg
- DPR on Energy Efficient Oil Fired Reheating Furnace_2000 Kg
- DPR on Energy Efficient Oil Fired Reheating Furnace_1200 Kg
Morbi Cermaic Cluster
- DPR on Briquette Fired Hot Air Generator (Morbi Cermaic Cluster)
- DPR on Energy Conservation in Agitation Section (Morbi Cermaic Cluster)
- DPR on Energy Conservation in Polishing Section (Morbi Cermaic Cluster)
- DPR on fabrication of dryer on tunnel kiln for pre heating of material (Morbi ceramic cluster)
- DPR on briquette fired hot air generator (Morbi ceramic cluster)
- DPR on energy conservation in polishing section (Morbi ceramic cluster)
- DPR on energy conservation in agitation section (Morbi ceramic cluster)
- DPR on gas engine based co-generation technology (Morbi ceramic cluster)
- DPR on gas turbine based co-generation technology (Morbi ceramic cluster)
- DPR on use of low thermal mass car in tunnel kiln
- DPR on variable frequency drive on grinding machine (Morbi ceramic cluster)
- DPR on variable frequency drive on hydraulic press (Morbi ceramic cluster)
- DPR on waste heat recovery in roller kiln (Morbi ceramic cluster)
- DPR on kiln insulation improvement (Morbi ceramic cluster)
- DPR on energy cost reduction by power factor improvement (Morbi ceramic cluster)
Orissa sponge iron cluster
- EE motor-crusher section 25HP-Orissa
- Energy efficient motor-crusher section 40HP-Orissa
- EE motor-Crusher section-60 HP-Orissa
- EE water pump for cooler main drive -15 HP-Orissa
- EE water pump for cooler main drive -20 HP
- Fuel economizer-50 tpd-Orissa
- Fuel economizer-100 tpd-Orissa
- Raw material preheating-50 tpd-Orissa
- Raw material pre heating-100 tpd-Orissa
- Raw material pre heating-200 tpd-Orissa
- Waste heat recovery power plant (2mw)–100tpd-Orissa
- Waste heat recovery power plant(4mw)– 200tpd-Orissa
Pali Textile Cluster
- DPR on provision of VFD in thermic fluid pump of Thermopac
- DPR on installation of waste heat recovery system in Stenter
- DPR on installation of VFD in jet dyeing machine
- DPR on installation of auto temperature controller in jigger dyeing machine
- DPR on Installation of Air Pre Heater in Thermopac (Pali Textile Cluster)
- DPR on Blower Speed Optimization in Stenter (Pali Textile Cluster)
- DPR on Installation of Condesate Recovery Pump in Jet Dyeing Machine (Pali Textile Cluster)
- DPR on provision of insulation on dust collector in thermopak (Pali textile cluster)
- DPR on installation of system for control of excess air in boiler (Pali textile cluster)
- DPR on installation of system for control of excess air in thermopac (Pali textile cluster)
- DPR on installation of exhaust humidity control system in stenters (Pali textile cluster)
- DPR on installation of fabric temperature control system in stenters (Pali textile cluster)
- DPR on provision of insulation in stenter motor operated valves (Pali textile cluster)
- DPR on Residual moisture measurement and control system in stenter (Pali textile cluster)
- DPR on solar water heater (Pali textile cluster)
Solapur Textile Cluster
- DPR on waste heat recovery through economizer in thermic fluid heater
- DPR on waste heat recovery through economizer in boiler
- DPR on VFD in doubling machine
- DPR on VFD for FD ID fan
- DPR on solar water heating(1000LPD)
- DPR on solar water heating (500LPD)
- DPR on solar water heating system (2000LPD)
- DPR on energy efficient hot water generator (80000kCal)
- DPR on energy efficient chulha
- DPR on energy efficient boiler (600kg)
- DPR on energy efficient boiler (400kg)
- DPR on energy efficient boiler (200kg)
- DPR on Auto Loom/ Rapier Loom (4Nos) (Solapur Textile Cluster)
- DPR on Auto Loom/ Rapier Loom (8Nos) (Solapur Textile Cluster)
- DPR on Hot Water Generator (10000kCal/hr) (Solapur Textile Cluster)
Surat Textile Cluster
- DPR on energy efficient boiler (3TPH)
- DPR on energy efficient boiler (4TPH)
- DPR on energy efficient pump in jet machine (150 kg)
- DPR on energy efficient pump in jet machine (250 kg)
- DPR on online flue gas monitoring system
- DPR on VFD in jet machine pump
- DPR on VFD senter machine blower
- DPR on waste heat recovery system (1.5 kL)
- DPR on waste heat recovery system (2.5 kL)
- DPR on energy conservation turbine (40 kW))
- DPR on energy conservation turbine(60 kW)
- DPR on naturak gas geberator base Co-gen system (600 kW)
- DPR on naturak gas geberator base Co-gen system (800 kW)
- DPR on stenter machine (6 Chamber)
- DPR on stenter machine (7 Chamber)