Case Studies

 

Installation of a 300 kg 100 kW induction furnace for brass melting in a foundry

Location : Jamnagar

Partners : MoMSME, UNIDO, GEF, BEE, MNRE

Read more

Installation of Auto Power Factor Controller (APFC) panel to maintain unity power factor in a foundry unit

Location : Coimbatore

Partners : MoMSME, UNIDO, GEF, BEE, MNRE

Read more

Installation of shot blast machine in cupola based foundry unit

Location : Kolhapur

Partners : GEF, World Bank, SIDBI, BEE, TERI, IIF-Kolhapur chapter, Kolhapur Engineering Association

Read more

Installation of solar PV rooftop system to generate electricity in a ceramic unit

Location : Thangadh

Partners : MoMSME, UNIDO, GEF, BEE, MNRE

Read more

Installing 60 HP screw compressor with in-built VFD in a foundry unit

Location : Coimbatore

Partners : MoMSME, UNIDO, GEF, BEE, MNRE

Read more

Installing energy efficient electrical resistance furnace of suitable capacity for melting aluminium

Location : Kolhapur

Partners : GEF, World Bank, SIDBI, BEE, TERI, IIF-Kolhapur chapter, Kolhapur Engineering Association

Read more

Installing IGBT (insulated gate bipolar transistor) controlled induction furnace in place of thyristor control furnace in a foundry

Location : Jamnagar

Partners : MoMSME, UNIDO, GEF, BEE, MNRE

Read more

Investment casting unit installs gas heat pump (GHP) system for drying castings, reduces energy consumption by 48%

Location : Rajkot

Partners : JICA, JST, IGES, TERI

Read more

MSME in Bokaro installs solar rooftop power plant; saves Rs 4.3 lakhs annually on power bill

Location : Bokaro

Partners : Industry associations in Bokaro

Read more

Non-ferrous foundry in Bokaro installs simple lid mechanism on its induction furnace - and saves Rs 3 lakhs annually!

Location : Bokaro

Partners : Industry associations in Bokaro

Read more
Secretary - SAMEEEKSHA, Industrial Energy Efficiency Division,
TERI, Darbari Seth Block, IHC Complex, Lodhi Road, New Delhi 110 003, India
Tel: +91 11 2468 2100, 2468 2111 | Email: sameeeksha@teri.res.in