Case Studies

 

Foundry in Rajkot saves over 9 lakh rupees annually, through performance optimization of its melting furnace at zero cost

Location : Rajkot

Partners : SDC, TERI, Rajkot Engineering Association (REA)

Read more

Foundry installs harmonic filter to improve power quality in the electrical network-and achieves significant cost saving through improved power factor, reduced distribution losses, and avoided penalties

Location : Coimbatore

Partners : MoMSME, UNIDO, GEF, BEE, MNRE

Read more

Foundry unit can replace inefficient air compressor with PMSM compressor, save 4 lakh rupees per year, and recover investment in less than 2 years

Location : Howrah, West Bengal

Read more

Fuel switch from furnace oil to natural gas in forging furnaces

Location : Pune

Partners : GEF, World Bank, SIDBI, BEE, TERI, Association of Indian Forging Industry (AIFI)

Read more

Fuel switch from HSD to natural gas for painting oven, water heater and pre-treatment tank

Location : Pune

Partners : GEF, World Bank, SIDBI, BEE, TERI, Association of Indian Forging Industry (AIFI)

Read more

High efficiency water pump and energy efficient lighting help a foundry cut energy costs with attractive payback on investments

Location : Rajkot

Partners : SDC, TERI, Rajkot Engineering Association (REA)

Read more

Howrah foundry replaces old blower-motor with an energy-efficient IE3 motor - and saves Rs 1.4 lakhs annually

Location : Howrah

Partners : Industry associations in Howrah

Read more

Howrah foundry saves over Rs 4 lakhs annually by replacing its fixed speed air compressor with a new, energy efficient PMSM inverter air compressor

Location : Howrah

Partners : Industry associations in Howrah

Read more

Howrah foundry unit saves Rs`5.8 lakhs annually by investing in a new energy-efficient pump - and recovers investment in 4 months!

Location : Howrah

Partners : Industry associations in Howrah

Read more

Huge energy savings achieved by forging unit through furnace insulation, veneering and best operating practices; investments paid back in barely three months!

Location : Pune

Partners : World Bank-GEF, SIDBI, BEE, AIFI, SB Engineers, TERI

Read more
Secretary - SAMEEEKSHA, Industrial Energy Efficiency Division,
TERI, Darbari Seth Block, IHC Complex, Lodhi Road, New Delhi 110 003, India
Tel: +91 11 2468 2100, 2468 2111 | Email: sameeeksha@teri.res.in