Case Studies
|
Huge energy savings achieved by forging unit through furnace insulation, veneering and best operating practices; investments paid back in barely three months!
Location : Pune
Partners : World Bank-GEF, SIDBI, BEE, AIFI, SB Engineers, TERI
Read more
Installation of a 300 kg 100 kW induction furnace for brass melting in a foundry
Location : Jamnagar
Partners : MoMSME, UNIDO, GEF, BEE, MNRE
Read more
Installation of Auto Power Factor Controller (APFC) panel to maintain unity power factor in a foundry unit
Location : Coimbatore
Partners : MoMSME, UNIDO, GEF, BEE, MNRE
Read more
Installation of shot blast machine in cupola based foundry unit
Location : Kolhapur
Partners : GEF, World Bank, SIDBI, BEE, TERI, IIF-Kolhapur chapter, Kolhapur Engineering Association
Read more
Installation of solar PV rooftop system to generate electricity in a ceramic unit
Location : Thangadh
Partners : MoMSME, UNIDO, GEF, BEE, MNRE
Read more
Installing 60 HP screw compressor with in-built VFD in a foundry unit
Location : Coimbatore
Partners : MoMSME, UNIDO, GEF, BEE, MNRE
Read more
Installing energy efficient electrical resistance furnace of suitable capacity for melting aluminium
Location : Kolhapur
Partners : GEF, World Bank, SIDBI, BEE, TERI, IIF-Kolhapur chapter, Kolhapur Engineering Association
Read more
Installing IGBT (insulated gate bipolar transistor) controlled induction furnace in place of thyristor control furnace in a foundry
Location : Jamnagar
Partners : MoMSME, UNIDO, GEF, BEE, MNRE
Read more
Investment casting unit installs gas heat pump (GHP) system for drying castings, reduces energy consumption by 48%
Location : Rajkot
Partners : JICA, JST, IGES, TERI
Read more
Optimizing combustion air supply in an NG-fired forging furnace
Location : Pune
Partners : GEF, World Bank, SIDBI, BEE, TERI, Association of Indian Forging Industry (AIFI)
Read more
Subscribe for SAMEEEKSHA Newsletter